ColinBuilds

Directory · Model comparison

Gemini 3.7 Flash vs Grok 4.6

Side-by-side API economics and benchmarks. Per-1M input and output rates, context window, and verified metrics.

Tale of the tape

Head-to-head specs pulled from each model profile.

Metric Gemini 3.7 Flash Grok 4.6
Input cost / 1M $0.75 $2.00
Output cost / 1M $3.75 $6.00
Context window 1,048,576 tokens 500,000 tokens
MMLU score

Cost verdict

Enter monthly input and output volumes to see total cost savings.

Gemini 3.7 Flash

Input: 1M × $0.75 = $0.75
Output: 1M × $3.75 = $3.75
Total
$4.50

Grok 4.6

Input: 1M × $2.00 = $2.00
Output: 1M × $6.00 = $6.00
Total
$8.00

Total cost savings

$3.50

Gemini 3.7 Flash saves $3.50 per month vs the other model at this volume.

Model routing savings

Uses this page's verified rates. Grok 4.6 is the premium route (higher combined per-1M cost); Gemini 3.7 Flash handles routine traffic.

Premium model

Grok 4.6

$2.00 in · $6.00 out / 1M

View profile →

Economical model

Gemini 3.7 Flash

$0.75 in · $3.75 out / 1M

View profile →

All premium

Grok 4.6

$400.00

100% of input and output on the premium route

Routed stack

80%Gemini 3.7 Flash

Grok 4.6

$260.00

Routine slice
$180.00
Premium slice
$80.00

Monthly savings

$140.00

35% lower

Rates pulled from this page's model database entries (grok-4-6, gemini-3-7-flash) — same per-1M input/output figures as Tale of the tape. Production routing needs quality gates and monitoring.

Related comparisons

More head-to-head model matchups.