ColinBuilds

Directory · Model comparison

Gemini 3.7 Flash vs Grok 4.3

Side-by-side API economics and benchmarks. Per-1M input and output rates, context window, and verified metrics.

Tale of the tape

Head-to-head specs pulled from each model profile.

Metric Gemini 3.7 Flash Grok 4.3
Input cost / 1M $0.75 $1.25
Output cost / 1M $3.75 $2.50
Context window 1,048,576 tokens 1,000,000 tokens
MMLU score

Cost verdict

Enter monthly input and output volumes to see total cost savings.

Gemini 3.7 Flash

Input: 1M × $0.75 = $0.75
Output: 1M × $3.75 = $3.75
Total
$4.50

Grok 4.3

Input: 1M × $1.25 = $1.25
Output: 1M × $2.50 = $2.50
Total
$3.75

Total cost savings

$0.75

Grok 4.3 saves $0.75 per month vs the other model at this volume.

Model routing savings

Uses this page's verified rates. Gemini 3.7 Flash is the premium route (higher combined per-1M cost); Grok 4.3 handles routine traffic.

Premium model

Gemini 3.7 Flash

$0.75 in · $3.75 out / 1M

View profile →

Economical model

Grok 4.3

$1.25 in · $2.50 out / 1M

View profile →

All premium

Gemini 3.7 Flash

$225.00

100% of input and output on the premium route

Routed stack

80%Grok 4.3

Gemini 3.7 Flash

$195.00

Routine slice
$150.00
Premium slice
$45.00

Monthly savings

$30.00

13.3% lower

Rates pulled from this page's model database entries (gemini-3-7-flash, grok-4-3) — same per-1M input/output figures as Tale of the tape. Production routing needs quality gates and monitoring.

Related comparisons

More head-to-head model matchups.