ColinBuilds.com

Directory · Model comparison

Gemini 3.1 Flash-Lite vs Grok Build 0.1

Side-by-side API economics and benchmarks. Per-1M input and output rates, context window, and verified metrics.

Tale of the tape

Head-to-head specs pulled from each model profile.

Metric Gemini 3.1 Flash-Lite Grok Build 0.1
Input cost / 1M $0.25 $1.00
Output cost / 1M $1.50 $2.00
Context window 1,048,576 tokens 256,000 tokens
MMLU score

Cost verdict

Enter monthly input and output volumes to see total cost savings.

Gemini 3.1 Flash-Lite

Input: 1M × $0.25 = $0.25
Output: 1M × $1.50 = $1.50
Total
$1.75

Grok Build 0.1

Input: 1M × $1.00 = $1.00
Output: 1M × $2.00 = $2.00
Total
$3.00

Total cost savings

$1.25

Gemini 3.1 Flash-Lite saves $1.25 per month vs the other model at this volume.

Model routing savings

Uses this page's verified rates. Grok Build 0.1 is the premium route (higher combined per-1M cost); Gemini 3.1 Flash-Lite handles routine traffic.

Premium model

Grok Build 0.1

$1.00 in · $2.00 out / 1M

View profile →

Economical model

Gemini 3.1 Flash-Lite

$0.25 in · $1.50 out / 1M

View profile →

All premium

Grok Build 0.1

$150.00

100% of input and output on the premium route

Routed stack

80%Gemini 3.1 Flash-Lite

Grok Build 0.1

$100.00

Routine slice
$70.00
Premium slice
$30.00

Monthly savings

$50.00

33.3% lower

Rates pulled from this page's model database entries (grok-build-0-1, gemini-3-1-flash-lite) — same per-1M input/output figures as Tale of the tape. Production routing needs quality gates and monitoring.

Related comparisons

More head-to-head model matchups.