ColinBuilds.com

Directory · Model comparison

Gemini 3.1 Flash-Lite vs Grok 4.3

Side-by-side API economics and benchmarks. Per-1M input and output rates, context window, and verified metrics.

Tale of the tape

Head-to-head specs pulled from each model profile.

Metric Gemini 3.1 Flash-Lite Grok 4.3
Input cost / 1M $0.25 $1.25
Output cost / 1M $1.50 $2.50
Context window 1,048,576 tokens 1,000,000 tokens
MMLU score

Cost verdict

Enter monthly input and output volumes to see total cost savings.

Gemini 3.1 Flash-Lite

Input: 1M × $0.25 = $0.25
Output: 1M × $1.50 = $1.50
Total
$1.75

Grok 4.3

Input: 1M × $1.25 = $1.25
Output: 1M × $2.50 = $2.50
Total
$3.75

Total cost savings

$2.00

Gemini 3.1 Flash-Lite saves $2.00 per month vs the other model at this volume.

Model routing savings

Uses this page's verified rates. Grok 4.3 is the premium route (higher combined per-1M cost); Gemini 3.1 Flash-Lite handles routine traffic.

Premium model

Grok 4.3

$1.25 in · $2.50 out / 1M

View profile →

Economical model

Gemini 3.1 Flash-Lite

$0.25 in · $1.50 out / 1M

View profile →

All premium

Grok 4.3

$187.50

100% of input and output on the premium route

Routed stack

80%Gemini 3.1 Flash-Lite

Grok 4.3

$107.50

Routine slice
$70.00
Premium slice
$37.50

Monthly savings

$80.00

42.7% lower

Rates pulled from this page's model database entries (grok-4-3, gemini-3-1-flash-lite) — same per-1M input/output figures as Tale of the tape. Production routing needs quality gates and monitoring.

Related comparisons

More head-to-head model matchups.