ColinBuilds

Directory · Model comparison

Claude Opus 5 vs Gemini 3.7 Flash

Side-by-side API economics and benchmarks. Per-1M input and output rates, context window, and verified metrics.

Tale of the tape

Head-to-head specs pulled from each model profile.

Metric Claude Opus 5 Gemini 3.7 Flash
Input cost / 1M $5.00 $0.75
Output cost / 1M $25.00 $3.75
Context window 1,000,000 tokens 1,048,576 tokens
MMLU score

Cost verdict

Enter monthly input and output volumes to see total cost savings.

Claude Opus 5

Input: 1M × $5.00 = $5.00
Output: 1M × $25.00 = $25.00
Total
$30.00

Gemini 3.7 Flash

Input: 1M × $0.75 = $0.75
Output: 1M × $3.75 = $3.75
Total
$4.50

Total cost savings

$25.50

Gemini 3.7 Flash saves $25.50 per month vs the other model at this volume.

Model routing savings

Uses this page's verified rates. Claude Opus 5 is the premium route (higher combined per-1M cost); Gemini 3.7 Flash handles routine traffic.

Premium model

Claude Opus 5

$5.00 in · $25.00 out / 1M

View profile →

Economical model

Gemini 3.7 Flash

$0.75 in · $3.75 out / 1M

View profile →

All premium

Claude Opus 5

$1,500.00

100% of input and output on the premium route

Routed stack

80%Gemini 3.7 Flash

Claude Opus 5

$480.00

Routine slice
$180.00
Premium slice
$300.00

Monthly savings

$1,020.00

68% lower

Rates pulled from this page's model database entries (claude-opus-5, gemini-3-7-flash) — same per-1M input/output figures as Tale of the tape. Production routing needs quality gates and monitoring.

Related comparisons

More head-to-head model matchups.