ColinBuilds.com

Directory · Model comparison

Claude Opus 4.8 vs Gemini 2.5 Flash

Side-by-side API economics and benchmarks. Per-1M input and output rates, context window, and verified metrics.

Tale of the tape

Head-to-head specs pulled from each model profile.

Metric Claude Opus 4.8 Gemini 2.5 Flash
Input cost / 1M $5.00 $0.30
Output cost / 1M $25.00 $2.50
Context window 1,000,000 tokens 1,000,000 tokens
MMLU score

Cost verdict

Enter monthly input and output volumes to see total cost savings.

Claude Opus 4.8

Input: 1M × $5.00 = $5.00
Output: 1M × $25.00 = $25.00
Total
$30.00

Gemini 2.5 Flash

Input: 1M × $0.30 = $0.30
Output: 1M × $2.50 = $2.50
Total
$2.80

Total cost savings

$27.20

Gemini 2.5 Flash saves $27.20 per month vs the other model at this volume.

Model routing savings

Uses this page's verified rates. Claude Opus 4.8 is the premium route (higher combined per-1M cost); Gemini 2.5 Flash handles routine traffic.

Premium model

Claude Opus 4.8

$5.00 in · $25.00 out / 1M

View profile →

Economical model

Gemini 2.5 Flash

$0.30 in · $2.50 out / 1M

View profile →

All premium

Claude Opus 4.8

$1,500.00

100% of input and output on the premium route

Routed stack

80%Gemini 2.5 Flash

Claude Opus 4.8

$412.00

Routine slice
$112.00
Premium slice
$300.00

Monthly savings

$1,088.00

72.5% lower

Rates pulled from this page's model database entries (claude-opus-4-8, gemini-2-5-flash) — same per-1M input/output figures as Tale of the tape. Production routing needs quality gates and monitoring.

Related comparisons

More head-to-head model matchups.